Municipal
Sewage Treatment
|
| |
|
| |

| Client: |
Ministry of Municipal and Rural
Affairs
Water and Sanitary Authority
Qassim Region
|
|
| Location: |
Qassim
Saudi Arabia
|
|
General Contractor:
|
Al Kharafi
|
|
| Electromechanical Contractor: |
EMCO Engineering |
|
|
|
|
| Sewage Lift Station: |
138,000 m3/day |
|
| Primary Treatment Plant: |
138,000 m3/day |
|
| Secondary Treatment Plant: |
138,000 m3/day (peak)
70,000 m3/day (average) |
|
| Tertiary Treatment Plant: |
138,000 m3/day (peak)
70,000 m3/day (average) |
|
Sewage Lift Station: |
One(1)
Five(5)
Two(2)
One(1)
|
Coarse bar screen
350 kw submersible pumps
Submersible mixers
Surge protection system |
| |
|
| Primary Treatment Plant: |
|
Four(4)
One(1)
One(1)
|
Mechanical fine bar screen
Screw compactor
Grit removal plant
|
| |
|
| Secondary Treatment Plant: |
Three(3)
Six(6)
Three(3)
One(1)
|
Aeration units
Clarifiers dia. 38.5 mm rotating mechanism
Thickeners
Activated sludge pumping station |
| |
|
| Tertiary Treatment Plant: |
Thirteen(13)
One(1) |
Deep bed gravity filtration
Gas chlorination feed system |
| |
|
| |
|
| 1 - |
Rotary Bridge
40 Meters Long
|
|
|
|
|
| 2 - |
Scrapers, FRP
Still Well & FRP Troughs |
|
|
|
|
| 3 - |
Six Clarifier
Systems |
|
|
|
|
| 4
- |
Intake
Grit - Lift Archimedes Pumps |
|
|
|
|
| 5
- |
Four
Aeration Basins with Surface Aerators |
|
|
|
|
| 6- |
Sludge
Thickener |
|
|
|
|
| 7 - |
Gas Chlorination
System |
|
|
|
|
| 8 - |
Overall Site Work |
 |
|
|